home *** CD-ROM | disk | FTP | other *** search
/ Space & Astronomy / Space and Astronomy (October 1993).iso / mac / TEXT_ZIP / spacedig / V13_3 / V13_365.ZIP / V13_365
Internet Message Format  |  1991-06-28  |  18KB

  1. Return-path: <ota+space.mail-errors@andrew.cmu.edu>
  2. X-Andrew-Authenticated-as: 7997;andrew.cmu.edu;Ted Anderson
  3. Received: from hogtown.andrew.cmu.edu via trymail for +dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl@andrew.cmu.edu (->+dist+/afs/andrew.cmu.edu/usr11/tm2b/space/space.dl) (->ota+space.digests)
  4.           ID </afs/andrew.cmu.edu/usr1/ota/Mailbox/UbzKf6m00WBwI9:U4w>;
  5.           Sat,  6 Apr 91 01:29:26 -0500 (EST)
  6. Message-ID: <AbzKewy00WBwQ98k4K@andrew.cmu.edu>
  7. Precedence: junk
  8. Reply-To: space+@Andrew.CMU.EDU
  9. From: space-request+@Andrew.CMU.EDU
  10. To: space+@Andrew.CMU.EDU
  11. Date: Sat,  6 Apr 91 01:29:17 -0500 (EST)
  12. Subject: SPACE Digest V13 #365
  13.  
  14. SPACE Digest                                     Volume 13 : Issue 365
  15.  
  16. Today's Topics:
  17.               Problems with TDK
  18.          Re: Let's build Freedom on the Moon
  19.                Space technology
  20.            Payload Summary for 04/03/91 (Forwarded)
  21.          Re: NY Times Article: Nuclear rocket
  22.              Re: nuclear rockets
  23.           comsat cancellations and lawsuits
  24. Gamma Ray Observatory ready for launch--last milestone reached (Forwarded)
  25.             SPACE Digest V13 #354
  26.  
  27. Administrivia:
  28.  
  29.     Submissions to the SPACE Digest/sci.space should be mailed to
  30.   space+@andrew.cmu.edu.  Other mail, esp. [un]subscription requests,
  31.   should be sent to space-request+@andrew.cmu.edu, or, if urgent, to
  32.              tm2b+@andrew.cmu.edu
  33.  
  34. ----------------------------------------------------------------------
  35.  
  36. ReSent-Message-ID: <Added.sbyn7xa00UkTI=708E@andrew.cmu.edu>
  37. Resent-Date:  Thu, 04 Apr 91 09:00:39 EST
  38. Resent-From: Harold Pritchett <HAROLD@uga.cc.uga.edu>
  39. Resent-To: Space discussion group <space+@andrew.cmu.edu>
  40. Date: 4 April 91, 09:25:11 MEZ
  41. From: Martin Meuer 06298-28361 CA1H at DLRVMLA@UGA.CC.UGA.EDU
  42. Subject: Problems with TDK
  43.  
  44. I am having problems getting the TDK program (version from 1985) to run
  45. on a VM/SP operating system.  The program originated from a VAX machine,
  46. and runs without errors with the same input data.
  47. After compilation without errors, the program runs and gives the follow-
  48. ing error message:
  49.                     AFB210I (operation exception)
  50.  
  51. This can mean that program code was distroyed while it was running.
  52. Does someone know what the difference is between these two systems which
  53. could cause this?  Please send any information to me directly.
  54.  
  55.  
  56. Martin Meuer
  57. CAP5@DLRVMLA
  58.  
  59. ------------------------------
  60.  
  61. Date: 5 Apr 91 01:15:57 GMT
  62. From: hub.ucsb.edu!ucsbuxa!3001crad@ucsd.edu  (Charles Frank Radley)
  63. Subject: Re: Let's build Freedom on the Moon
  64.  
  65. In article <1991Apr3.152013.18415@watdragon.waterloo.edu> jdnicoll@watyew.uwaterloo.ca (James Davis Nicoll) writes:
  66.  
  67. As Rus Cage beat into me in an exchange a couple of months ago:-
  68. most of the loading on the pressurized modules is from the
  69. air pressure, the gravity loads are smaller, but yes, need to
  70. be considered.
  71.   The 90 day study was conceptual.   Indeed, if the modules
  72. were totally or partially burried conceivably the weight of
  73. lunar material could take some of the linternal air pressure
  74. load.
  75. .
  76.  
  77. >In article <10256@hub.ucsb.edu> 3001crad@ucsbuxa.ucsb.edu (Charles Frank Radley) writes:
  78. >>
  79. >>
  80. >>The NASA 90 day study proposed exactly that ..  a lunar base
  81. >>composed initially of Freedom modules.
  82.  
  83. >    How much redesign would be necessary to adapt a structure
  84. >designed to be used in free fall to be useful in 1/6 gravity?
  85. >Would it be cheaper to design a structure intended to be used on
  86. >the Moon?
  87.  
  88. >                            James Nicoll
  89.  
  90. ------------------------------
  91.  
  92. Date: 4 Apr 91 13:30:22 GMT
  93. From: nb0x+@andrew.cmu.edu  (Nick A. Bucci)
  94. Subject: Space technology
  95.  
  96.  
  97.    I recently got into a "discussion" (argument is a better term) with
  98. my father about the need for a space program.  Being an old fashioned,
  99. middle class, construction worker, he disagrees with the concept of
  100. spending "a lot of money for nothing."  I tried to show him how our
  101. lives have benifited directly from space exploration:  New products, new
  102. technology, etc., but he remains unconvinced.
  103.     I would greatly appreciate any list of products, etc., that came as
  104. a direct result of the Space program (both U.S. & international).  Maybe
  105. if I give him enough tangible evidence, I can win him over.
  106.     Also, let me know if I should post a comprehensive list as one is
  107. formed.  I apoligize in advance for any errors, I'll just list what I'm
  108. given, though I'd appreciate feedback on the list so I can correct any
  109. mistakes.
  110.     Thanks in advance.
  111.                 -Nick A.Bucci
  112.  
  113. ------------------------------
  114.  
  115. Date: 4 Apr 91 19:12:30 GMT
  116. From: usenet@ames.arc.nasa.gov  (Peter E. Yee)
  117. Subject: Payload Summary for 04/03/91 (Forwarded)
  118.  
  119.  
  120.                                PAYLOAD TEST AND ACTIVITY SHEET
  121.                                Kennedy Space Center, Florida
  122.                                April 3, 1991
  123.  
  124.  
  125.           George Diller
  126.           407/867-2468
  127.           FTS 823-2468
  128.  
  129.  
  130.           GAMMA RAY OBSERVATORY
  131.           STS-37/Atlantis
  132.  
  133.           HISTORICAL SUMMARY
  134.  
  135.           Arrival of Spacecraft at PHSF: 2/6/90
  136.           First functional test begins: 2/26
  137.           Install High Gain Antenna: 11/8
  138.           Final functional test complete: 12/4/90
  139.           Spacecraft Fueling complete: 1/11/91
  140.           Install Flight Batteries: 1/15
  141.           First Joint Integrated Simulation (JIS): 1/16
  142.           Airborne Electrical Support Equipment (AESE) arrives at VPF: 1/24
  143.           Astronaut payload sharp edge inspection: 1/29
  144.           Install orbiter Airborne Electrical Support Equipment (AESE): 2/1
  145.           Transfer GRO to Vertical Processing Facility: 2/7
  146.  
  147.           Installation into VPF west test cell: 2/9
  148.           VPF Stand-alone Functional Test: 2/12-13
  149.           Interface Verification Test (IVT) of AESE: 2/17
  150.           IVT of GRO (orbiter interfaces simulated): 2/22
  151.           End-to-end (ETE) communications test (MILA/GSFC/TDRS): 2/25
  152.           Payload Readiness Review: 2/25
  153.           MILA RF communications test: 3/4
  154.           Transfer payload to canister: 3/11
  155.           Roll to Pad 39-B/Transfer to PCR: 3/13
  156.  
  157.           Initial GRO Battery Charging: 3/13
  158.           Payload installation into Atlantis: 3/17
  159.           Astronaut payload bay sharp edge inspection: 3/19
  160.           Interface Verification Test (IVT):  3/21
  161.           GRO end-to-end test: 3/25
  162.           Battery reconditioning:  3/25-3/30
  163.           Final JIS-Nominal Day 3 deploy: 3/27
  164.           GRO final closeouts for flight: 4/1
  165.           Close payload bay doors: 4/2
  166.  
  167. ------------------------------
  168.  
  169. Date: 4 Apr 91 21:14:09 GMT
  170. From: agate!bionet!uwm.edu!cs.utexas.edu!sun-barr!newstop!exodus!norge.Eng.Sun.COM!jmck@ucbvax.Berkeley.EDU  (John McKernan)
  171. Subject: Re: NY Times Article: Nuclear rocket
  172.  
  173. bpendlet@bambam.dsd.es.com (Bob Pendleton) writes:
  174. >Personally I'm glad to hear that they are developing the pellet bed
  175. >reactor for propulsion applications. BUT, I'm very distressed to hear
  176. >that they were looking at using it inside the atmosphere.
  177.  
  178. Why assume, a priori, that testing anything nuclear in the atmosphere
  179. would be a bad thing. This is new technology, so we really have no idea
  180. how much radioactivity a nuclear rocket of this design would give off.
  181. If the amount of radiation released is low and both the thrust and the
  182. ISP are high, such a nuclear rocket might be a very good replacement
  183. for or supplement to chemical rockets. Although the the impression I
  184. get is that they are many many dollars away from a flyable system, so
  185. the whole "nukes in the atmosphere" flap is probably moot anyway.
  186.  
  187. John L. McKernan.                                                  jmck@sun.com
  188. Disclaimer: These are my opinions but, shockingly enough, not necessarily Sun's
  189. -------------------------------------------------------------------------------
  190.    "It's kind of a macho thing,
  191.     programmers are always trying to be weirder than their machines."
  192.  
  193. ------------------------------
  194.  
  195. Date: 4 Apr 91 16:21:48 GMT
  196. From: agate!bionet!uwm.edu!rpi!news-server.csri.toronto.edu!utzoo!henry@ucbvax.Berkeley.EDU  (Henry Spencer)
  197. Subject: Re: nuclear rockets
  198.  
  199. In article <1991Apr4.061604.26761@leland.Stanford.EDU> gooch@leland.Stanford.EDU (Carl Gooch) writes:
  200. >... the fissionable material was imbedded in small carbon (?) pellets.
  201. >The hydrogen coolant passed through this flock of particles and left
  202. >in a big hurry, Isp ~ 1000 sec.  Since the fissionable material and
  203. >fission products are never exposed to the coolant stream, the nastier
  204. >bits of radiation were neatly contained.  
  205.  
  206. Well, yes and no.  Very few reactors directly expose their coolant to the
  207. fissionable material.  The problem is that some of the fission products
  208. get out anyway.  Radioactive xenon, in particular, is difficult to contain.
  209. Nuclear-thermal rockets, which by their nature run their reactors hot and
  210. hard, always have a non-zero fission-product content in their exhausts.
  211. -- 
  212. "The stories one hears about putting up | Henry Spencer @ U of Toronto Zoology
  213. SunOS 4.1.1 are all true."  -D. Harrison|  henry@zoo.toronto.edu  utzoo!henry
  214.  
  215. ------------------------------
  216.  
  217. Date: 4 Apr 91 16:33:20 GMT
  218. From: agate!bionet!uwm.edu!spool.mu.edu!sdd.hp.com!zaphod.mps.ohio-state.edu!rpi!news-server.csri.toronto.edu!utzoo!henry@ucbvax.Berkeley.EDU  (Henry Spencer)
  219. Subject: comsat cancellations and lawsuits
  220.  
  221. In article <1991Apr3.120101.12230@pbs.org> pstinson@pbs.org writes:
  222. >...  As a case in point take Hughes Galaxy's recent attempt
  223. >to file a breach of contract suit against NASA because the shuttle is no longer
  224. >permitted to launch comsats.  This situation came about because of the
  225. >CHALLENGER disaster in which SEVEN PEOPLE DIED.  In the aftermath of this, it
  226. >was decided not to risk future crews on missions such as comsat launches...
  227.  
  228. Hughes is not suing over the decision to take comsats off the shuttle; it
  229. is suing over the government's refusal to compensate innocent customers for
  230. the financial losses they incurred when the government broke its promises.
  231. There were good reasons to *renegotiate* those promises, perhaps to turn
  232. them into expendable launches.  That's not what the government did; it said
  233. "well, those promises are no longer operable, that's the way the cookie
  234. crumbles guys, go away and don't bother us".
  235.  
  236. Agreed that the US is lawsuit-happy, for which government tax and financial
  237. policy bears no small share of the blame... but Hughes got a seriously raw
  238. deal on this one, and has every right to be ticked off.
  239. -- 
  240. "The stories one hears about putting up | Henry Spencer @ U of Toronto Zoology
  241. SunOS 4.1.1 are all true."  -D. Harrison|  henry@zoo.toronto.edu  utzoo!henry
  242.  
  243. ------------------------------
  244.  
  245. Date: 4 Apr 91 19:14:55 GMT
  246. From: usenet@ames.arc.nasa.gov  (Peter E. Yee)
  247. Subject: Gamma Ray Observatory ready for launch--last milestone reached (Forwarded)
  248.  
  249.  
  250.           George Diller                                   April 3, 1991
  251.           Kennedy Space Center
  252.           407/867-2468
  253.  
  254.           KSC Release No. 42-91
  255.  
  256.  
  257.           GAMMA RAY OBSERVATORY READY FOR LAUNCH--LAST MILESTONE REACHED
  258.  
  259.  
  260.                The payload bay doors of the Space Shuttle Atlantis were
  261.           closed for flight at 9:50 A.M. on Tuesday, April 2, concluding
  262.           over 15 months of testing and prelaunch preparation of the Gamma
  263.           Ray Observatory (GRO) by the NASA/TRW payload test team.
  264.  
  265.                GRO arrived at the Kennedy Space Center on February 6, 1990,
  266.           and was placed in the Payload Hazardous Servicing Facility (PHSF)
  267.           located in the KSC Industrial Area where final assembly, fueling,
  268.           and functional testing were performed.  The spacecraft was loaded
  269.           with 4,200 gallons of hydrazine propellant, the largest quantity
  270.           ever to be loaded aboard a satellite.
  271.  
  272.                With the remanifesting of Space Shuttle flights during 1990
  273.           because of the hydrogen leak difficulty, NASA and TRW management
  274.           took advantage of having additional time to study each of the
  275.           problems on the Hubble Space Telescope to determine whether they
  276.           might also apply to the Gamma Ray Observatory.  The test team
  277.           researched engineering specifications and historical test data in
  278.           search of any problems which may have gone undetected.  In
  279.           addition, more contingency planning was done based on the Hubble
  280.           experience.
  281.  
  282.                By the time GRO was ready to be moved to the Vertical
  283.           Processing Facility (VPF) for its integrated testing, the team
  284.           was confident they would not have similar problems and that
  285.           indeed every system on the Observatory was functioning as
  286.           designed.
  287.  
  288.                The astronauts also had an opportunity to inspect GRO at the
  289.           conclusion of its testing in the PHSF.
  290.  
  291.                On February 7, 1991, a year and a day after the spacecraft
  292.           arrived at KSC, it was moved to the VPF to begin checkout of its
  293.           Space Shuttle interfaces.  The NASA/McDonnell Douglas team at KSC
  294.           verified that all was in readiness, and that associated
  295.           communications links were operating.  On March 13, the Gamma Ray
  296.           Observatory was moved to the launch pad, and loaded aboard the
  297.           Space Shuttle Atlantis four days later.
  298.  
  299.                While GRO fills only half of the payload bay of Atlantis, it
  300.           weighs in at 34,493 pounds, the heaviest satellite to be deployed
  301.           by the Space Shuttle into low Earth orbit.
  302.  
  303.                After interface checks and a brief functional test, followed
  304.           by a final communications checkout, the flight batteries were
  305.           reconditioned and a trickle charge established.  Removing the
  306.           trickle charge and reading the battery voltages are the last
  307.           items on the checklist before commiting GRO to launch.  This
  308.           operation occurs 50 minutes before the liftoff.
  309.  
  310.                "With the payload bay doors closed, we've reached a point
  311.           we've been anticipating for a long, long time," said Observatory
  312.           Manager Marty Davis from the Goddard Space Flight Center.
  313.           "There's no remaining work to be done.  Now its just  the anxious
  314.           wait."
  315.  
  316. ------------------------------
  317.  
  318. ReSent-Message-ID: <Added.kbyxf0u00UkTM1ck86@andrew.cmu.edu>
  319. Resent-Date:  Thu, 04 Apr 91 20:28:22 EST
  320. Resent-From: Tommy Mac <18084TM@msu.edu>
  321. Resent-To: space+@andrew.cmu.edu
  322. Date:         Thu, 4 Apr 91 03:33:07 EST
  323. Reply-To: space+%ANDREW.CMU.EDU@msu.edu
  324. From: space-request+%ANDREW.CMU.EDU%CARNEGIE.BITNET@msu.edu
  325. Subject:      SPACE Digest V13 #354
  326. Comments: To: space+@ANDREW.CMU.EDU
  327. To: david polito <15432DJP@MSU.BITNET>, Tom McWilliams <18084TM@MSU.BITNET>
  328.  
  329. Re: Fred on the Moon
  330.  
  331. Danny McGurl Asks:
  332.  
  333. TM: [lot's of reasons to place Fred on the moon]
  334.  
  335. DM: I can only see two major problems with this:
  336.  
  337. DM: 1) Where do you do the 0g crystal growing?
  338.  
  339. Well, I guess the crystals would have to be grown in 0G.  :-)
  340. i.e. not on the moon.  Seriously, though, there is the question of whether or
  341. not growing crystals is a real efficient use of the resources that would become
  342. available.
  343.  
  344. One could also hypothesize that with a moon base, and travel between the two
  345. planets, some sort of way station would probably be created that could do
  346. microgravity production.  You could also speculate that the moon base itself
  347. would lead to the production of a number of space colonies becuase of the G.
  348. O'neill-type-infrastructure potential.
  349.  
  350. DM: 2)Do you gain anything because you have to have extra fuel and packaging
  351. DM: to land on the moon, and then get materials back.
  352.  
  353. Disclaimer:  Read 1) High Frontier, G. O'neill, for the idea,
  354.       followed by 2) Space Resources, for a rough idea of what's out there,
  355.       followed by 3) the CRC handbook; Space Industrialization (2 vol.)
  356.  
  357. These will give you much more detail about the possibilities than I can, but to
  358. summarize:  YES!  The energy to escape the moon is .05 that to get off Earth.
  359. If you use the EM launcher (which is not limited by friction), you need only
  360. import the structure, not the fuel, (solar power), so maintainence payloads are
  361. small.
  362.      Not too much is known about what, exactly, is available on the moon.  Most
  363. people will agree that there is abundunt iron, silicon and oxygen.  Specualtion
  364. is king, since so little of the moon has actually been explored.  But with a
  365. base there, you can bet that there will be expeditions to find anything that
  366. could be mined easier than lifted from earth.
  367.      The one I've heard the most about is water (or co2, o2, n2) ice that's
  368. been trapped in permanently dark craters at the poles.  We'll see. (I hope!)
  369.  
  370. I might point out that the best use for materials from the moon would be to
  371. build up the base on the moon.  I.E. save launch costs from earth and the moon.
  372.  
  373. Sheilding from cosmic radiation:  Moon has lots of dirt
  374. Glass for windows (greenhouses?): Moon has lots of silicon
  375. Heat for industry (making glass?):  Solar energy (2 week battery not included)
  376. Electricity :                      Ditto (Ditto for the battery, too)
  377. Grid for solar generator         : Silicon and processing both done on Moon
  378. Turbine for solar furnace?       : Iron/Nickel on Moon
  379. Dirt for green houses            : Dirt from Moon
  380.  
  381. Naturally there are enourmous difficuties that I'm completely glossing over in
  382. my enthusiasm, but the bottom line is, as always: it's not the concept, it's
  383. the engineering.
  384.  
  385. Tommy Mac             Hey, I like that!
  386. 18084tm@msu.bitnet      "The concept is not the limiting factor;
  387. Mich. State. U.          the engineering is." - armchair aerospace enthusiast
  388. Acknowledge-To: <18084TM@MSU>
  389.  
  390. ------------------------------
  391.  
  392. End of SPACE Digest V13 #365
  393. *******************
  394.